As the preliminary engineering is developed further, the projects have become more individualized and now have a separate page for each site. Please see the pages for:
Projects - Penta-Platform
- Rippon Station Improvements
-
This improvement project will involve the design and construction of a 250-foot extension of the existing platform and a second platform. A new pedestrian overpass will be added with stairs and elevators on each platform will allow for cross-track passenger circulation.
- Lorton Station Second Platform
-
We're designing and constructing a second, 700-foot-long island platform at Lorton Station, across the tracks from the current platform
- Leeland Road Station Improvements
-
This improvement project will involve the design and construction of 700-foot long side and island platforms. A new pedestrian overpass will be added with stairs and elevators on each platform will allow for cross-track passenger circulation.
- Franconia-Springfield Station Improvements
-
The proposed improvements include lengthening the existing west platform adjacent to WMATA Metrorail and lengthening/widening the existing east platform to accommodate an eight-car train consist.
- Brooke Station Improvements
-
This improvement project will involve the design and construction of 700-foot long side and island platforms. A new pedestrian overpass will be added with stairs and elevators on each platform to allow for cross-track passenger circulation.