Project Description

The station is situated in the Town of Quantico at 550 Railroad Avenue and adjacent to the US Marine Corps Base Quantico. Quantico Station is presently served by Amtrak and VRE passenger trains. The railroad segment where the station is located is owned, maintained, and controlled by CSXT, which also operates freight trains on all tracks through the station. There are currently two mainline tracks through the station. Passenger trains are primarily routed to Track 2, which has a low-level side platform adjacent to the historic station building and parking lot. On rare occasions, passenger trains are routed to the other track (Track 3) when necessary due to traffic conflicts or other disrupted service condition. There is a low-level temporary side platform serving Track 3 that is used only by Amtrak trains. VRE trains do not use the Track 3 platform. When VRE trains are routed via track 3, the standard operating procedure is to position one door on the Potomac Avenue grade crossing adjacent to the station and board and alight passengers at street-level. CSXT and the Virginia Department of Rail and Public Transportation (DRPT) are presently engaged in constructing a new third mainline track through Quantico Station as part of the Arkendale-Powells Creek Third Track Project. DRPT and VRE are also collaborating on the Quantico Station Improvement Project in conjunction with the third track project. The station improvement project will replace the Track 3 side platform with a new island platform between the existing Track 3 and the new third track, extend and improve the existing platform on Track 2, provide a grade-separated pedestrian crossing, and other safety improvements. VRE is designing and constructing an island platform, pedestrian bridges; extension of the existing platform; and track modifications. Improvements are being coordinated with the ongoing Arkendale to Powell's Creek third track project being implemented by DRPT and CSXT, along with numerous stakeholders including but not limited to: Federal Railroad Administration (FRA), Marine Corps Base Quantico (MCBQ), Town of Quantico, and Prince William County (PWC).

 


Project Purpose

Quantico Station Project Improvements will accomplish operational efficiencies by providing platform edges on all 3 tracks, as well as helping to facilitate and accomplish the successful design, construction, and putting into service of the proposed 3rd track.

 


Anticipated Project Schedule:

Phase Start Date Finish Date
Development 1/1/2015 11/30/2024

Current Phase: Construction

Phase Image Phase Image

Project Cost:

$27,009,714.00

Project Documents

There are no documents for this project.

Latest Updates

  • Project Note 1:
    Final Punchlist and project closeout being accomplished. PWC Final Inspections and Final Occupancy anticipated January 2025. Final Project closeout anticipated first quarter calendar 2025. - 1/7/2025

  • Project Note 2:
    Project In-Service/Substantial Completion 12/9/2024. Final Punchlist and project closeout being accomplished. Final Project closeout anticipated early 2025. - 12/10/2024

  • Project Note 3:
    Ribbon Cutting November 1, 2024. Temporary Certificate of Occupancy Received from Prince William County November 1, 2024. Station anticipated in service this month of November. Project Substantial Completion anticipated this month of November. Punchlist i

Contact Project Manager: [email protected]