Seminary Yard MSRF

back to projects list

Project Description

VRE proposes to construct a permanent midday storage replacement facility for VRE trains that travel to and from the District of Columbia. The facility's proposed location is at the former Norfolk Southern yard at seminary passage in Alexandria Virginia at the converging point of VRE’s Fredericksburg line and Manassas line. VRE evaluated a wide range of potential alternative sites in Maryland, Virginia, and the District of Columbia for the relocated storage facility, taking into consideration operations, access, environmental, community, and cost criteria. The new permanent facility will supplement the current storage space provided by the National Railroad Passenger Corporation (Amtrak) in Washington, DC. VRE trains are currently stored during the day in Amtrak's Coach Yard. Amtrak identified the need to store additional intercity trains in this location and that requires VRE to relocate from the Amtrak Coach Yard rail facility.

Project Purpose

The midday storage replacement facility at Seminary Yard in Alexandria, VA is strategically located at the convergency point of the VRE Manassas and Fredericksburg Lines. VRE will no longer be able to storge trains at the Amtrak Coach Yard in Washington, DC due to the expansion of the Amtrak fleet and this new alternative storage facility in necessary to maintain and improve VRE operations.

Anticipated Project Schedule:

Phase Start Date Finish Date
Development 2/6/2025 6/30/2026
Property Acquisition 7/1/2025 6/30/2026
Final Design 9/1/2026 2/1/2028
Construction 7/1/2028 2/1/2029

Current Phase: Development

Phase Image Phase Image

Project Cost:

$75,899,512.00

Project Documents

There are no documents for this project.

Latest Updates

  • 7/1/2026
    VRE finalized acquisition of the Seminary Maintenance and Storage Facilty (MSF) property from VPRA on June 29th. The design team is actively addressing VRE review comments on the final conceptual design phase deliverables, with the objective of closing out the task order by the end of July.

  • 6/9/2026
    VRE’s design consultants are completing the conceptual design phase, with final deliverables expected this month. These include the Seminary Yard master plan, conceptual design drawings, a basis of design report, and a 15% cost estimate and project schedule. Following the conclusion of conceptual design, VRE will transition into the final design phase.

  • 5/8/2026
    VRE held a facility design working group meeting with staff on 5/6/26 to review the pre-final concept design master plan. Phase 1A track maintenance work is wrapping up this week, and VRE will soon be able to use the facility’s northern entrance, providing increased operational flexibility.